fbpx 01 02 03 04 05 06 07 08

San Antonio, Texas

Audie L. Murphy Memorial
VA Hospital Refub

About

Audie L. Murphy Memorial
VA Hospital Refub

Refurbish Mental Health Floor GLA-GLC

Prime Architects designed and provided architectural and engineering services for construction drawings and specifications to replace flooring finishes on the Mental Health Floor.

Project was renovation work in a specialized setting, which required attention to detail and tjlkuckhe controlling of the spaces due to patients actively occupying and using the facility during construction.

The project included demolition of existing flooring and surface preparation for installation of new flooring.

Challenges encountered with the project included maintaining a level of adequate security for the patients and staff.

Details

Size:

Approx. 7,400 SF

Est Construction Value:

$500,000

Location:

San Antonia, Texas

Project Owner:

Department of Veterans Affairs, Central Texas Veterans HCS

Year Completed:

Professional Services: 2015-2016
Construction: 2016

Project Role:

Prime A-E Firm – Project Management, Architecture, Planning & Interior Design

More Renovations

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.