Prime Architects designed replacement of the mission-critical backup generators serving Buildings 2 and 4. Each new generator sits in its own new building with upgraded security features. The Building 2 generator location required relocating an existing underground power feed.

Technical Scope

  • Electrical: New emergency generators replace the units serving two power systems (Buildings 2 and 4). Demolition and removal of the existing generators.
  • Architecture: New generator buildings of 1,400 SF and 500 SF with upgraded security features. Repairs to existing buildings as needed.
  • Civil/Site: Relocation of an existing underground power feed serving the north entrance to Building 15.
  • Structural: Structural design by 360 Engineering.
  • Physical Security: Physical security scope, with Force Protect as consultant.
  • Deliverables: Design Analysis Report, drawings, specifications and a bid cost estimate.

Project Data:

  • Client / agency: Department of Veterans Affairs, West Texas VA Health Care System
  • Location: George H. O'Brien VAMC, Big Spring, TX
  • Size: Two new generator buildings, 1,400 SF and 500 SF
  • Est. construction cost: $2,525,252 (35% design cost estimate, Oct 2021)
  • Completed: Design 2020
  • Project type: Infrastructure (emergency power replacement)
  • Facility condition: Occupied building
  • Prime Architects role: Prime A/E: planning, architecture, project management; QC, inspection services and cost control
  • Design team: 360 Engineering — structural; Force Protect — physical security