Overview
Prime Architects designed the full replacement of the main kitchen air handling unit in Building 1. The new custom AHU supplies 15,000 CFM. The kitchen stayed in operation for the entire replacement.
Technical Scope
- Mechanical: Custom AHU AH-1-SB4-1: 15,000 CFM supply, 12,750 CFM return, 2,250 CFM minimum outside air (15%).
- Mechanical – coils: Two chilled water coils at 246 MBH each (492 MBH, approx. 41 tons), 44/56°F. Two steam coils at 230 MBH each (460 MBH).
- Mechanical – fans: Fan array of six 2,500 CFM direct-drive plenum fans with ECM motors.
- Mechanical – air quality and hygiene: MERV 7 pre-filters, UVC lights, stainless steel drain pans per ASHRAE 62.1, washdown-capable liner.
- Mechanical – steam: New steam condensate pump.
- Controls: DDC upgrade with 0–10 VDC fan speed control.
- Electrical: Local electrical and electrical service for the new unit.
- Associated components: Ductwork, piping, valves, alarms and dampers.
- CPS: Construction Period Services through construction; third-party commissioning agent procured by Prime Architects.
Challenge and Solution
The hospital kitchen could not shut down. Temporary HVAC was installed before and kept running throughout the replacement.
Project Data:
- Client / agency: Department of Veterans Affairs, Overton Brooks VAMC (VA Project No. 667-16-102)
- Location: Main Kitchen, Building 1, Overton Brooks VAMC, Shreveport, LA
- Size: One custom AHU (AH-1-SB4-1), 15,000 CFM supply
- Est. construction cost: $439,230
- Completed: 2017
- Project type: Infrastructure
- Facility condition: Occupied hospital; main kitchen stayed in operation
- Prime Architects role: Prime A/E: project management, architecture, planning; construction documents and Construction Period Services; procurement of third-party commissioning agent
- Design team: MEP Associates (now Salas O'Brien) (MEP engineering); 360 Engineering (structural); OCMI, Inc. (cost estimating)
- Criteria: ASHRAE 62.1 (drain pans)
Relevant If Your Project Involves:
- AHU replacement
- Hospital kitchen HVAC
- Fan array
- Temporary HVAC
- Steam and chilled water coils
Project Category:
Part of our VA and federal healthcare architecture work. See the full market page for related projects, standards and how we team on this type of facility.