Prime Architects designed the renovation of the Building 1 first-floor east wing to house Oncology and Hematology. The work took place in a busy, occupied building. Medical care functions had to continue without interruption, so construction was phased and coordinated with the VA COR and users.
Technical Scope
- Assessment/Pre-design: Reviewed the proposed site for feasibility and constructability and suggested alternatives. Interviewed affected staff and investigated existing conditions.
- Architecture/Interiors: Demolition and removal; new and reconfigured drywall partitions; new ceiling, wall and floor finishes; new casework; installation of government-furnished equipment.
- Mechanical / Plumbing / Electrical / Fire Protection: Mechanical, plumbing, lighting, fire protection and electrical systems upgraded as necessary.
- Hazardous Materials: Reviewed the local asbestos survey to identify remediation areas. Abatement of asbestos identified on the drawings.
- Physical Security: Design followed VA supplemental physical security directives.
- CPS: Construction Period Services included in the contract.
Challenge and Solution
The department had to stay operational in an occupied hospital. Construction was phased and coordinated with the VA COR and users to keep care uninterrupted.
Project Data:
- Client / agency: Department of Veterans Affairs, Veterans Health Administration
- Location: Wichita VAMC (Robert J. Dole VAMC), Building 1, first floor east wing, Wichita, KS
- Size: 8,000 SF
- Est. construction cost: $2,890,083
- Completed: Design 2019 – construction 2021
- Project type: Renovation
- Delivery / contract: Task order
- Facility condition: Occupied medical center; medical care maintained without interruption during construction
- Prime Architects role: Prime A/E: project management, architecture, planning, interior design; site investigation, feasibility and constructability review, specifications, cost estimates; Construction Period Services
- Design team: OCMI, Inc. (SDVOSB), Dallas TX — cost estimating
- Criteria: VA A/E Submission Instructions for Minor and NRM Construction Program, Program Guide PG-18-15, Volume C; VA supplemental physical security directives
Relevant If Your Project Involves:
- clinic relocation in an occupied hospital
- oncology/hematology space
- asbestos survey review
- phased interior renovation
- PG-18-15 submissions
Project Category:
Part of our VA and federal healthcare architecture work. See the full market page for related projects, standards and how we team on this type of facility.