Food Warehouse Building for the Federal Bureau of Prisons

Prime Architects designed the Food Warehouse Building for the Federal Bureau of Prisons in El Reno, Oklahoma. This project involved the design and construction of a prefabricated metal building. This facility, measuring 50 feet by 50 feet, sits on a concrete slab with insulation beneath the cooler and freezers, supported by footings. The building includes a receiving dock, a 50′ x 50′ dry storage area, a 25′ x 50′ cooler, and two 25′ x 50′ freezers. All necessary mechanical, electrical, and plumbing utilities were integrated into this design.

Prime Architects conducted extensive site visits, field investigations, studies, and user interviews to ensure a comprehensive understanding of the site’s needs. The construction process encompassed pre-design, construction, bidding, followed by construction service phases. The primary focus was on creating a new warehouse equipped with freezers and a cooler to meet the specific requirements of the Federal Bureau of Prisons.

Located in El Reno, Oklahoma, this project highlights Prime Architects’ commitment to delivering high-quality architectural solutions for government clients. The firm provided project management and architecture, as well as planning services, ensuring that the project was completed on time and within budget. The design of the warehouse not only meets the functional needs of the facility but also adheres to the stringent standards required for federal projects.

Prime Architects’ approach to this project demonstrates their expertise in managing complex architectural and engineering systems. In addition to identifying and understanding the client’s goals and objectives, we were also able to deliver a facility that added significant value to the Food Warehouse Building for the Federal Bureau of Prisons. In summary, Prime Architects handled this large-scale government project with precision and efficiency.

Project Scope:

  • Client: Federal Bureau of Prisons
  • Size: n/a
  • Location: El Reno, OK
  • Services: Project Management, Architecture, Planning

Key Features:

  • Prefabricated metal building
  • Concrete slab with insulation beneath cooler and freezers
  • Footings for support
  • Receiving dock and dry storage area with dock lever
  • 25' x 50' cooler and two 25' x 50' freezers
  • Phased construction in an active correctional institution