Fire Alarm Replacement, FCC Beaumont

Overview

Prime Architects designed full replacement of the EST-3 fire alarm system with an EST-4 platform across FCC Beaumont. The scope covers 10 buildings housing 4,650 inmates. The secure complex had to keep operating without interruption.

Technical Scope

  • Fire Protection/Life Safety: Removal of the legacy EST-3 system. New EST-4 panels, annunciators, detectors, strobes and pull stations, with a campus-wide graphical interface.
  • Electrical: Selective reuse of existing conduit and wiring where feasible to cut cost and disruption. Design to NEC.
  • Design phases: 35%, 65% and 100% submittals.
  • CPS: Submittal reviews, RFI responses and four on-site inspections; FBOP reviews, operational planning and commissioning.

Project Data:

  • Client / agency: Federal Bureau of Prisons
  • Location: Federal Correctional Complex (FCC), Beaumont, TX
  • Size: 10 buildings, campus-wide; inmate population 4,650
  • Est. construction cost: $9,707,908
  • Completed: Design 2025 / construction TBD
  • Project type: Infrastructure (fire alarm system replacement)
  • Delivery / contract: Design-bid-build
  • Facility condition: Active federal correctional facility
  • Prime Architects role: Prime A/E: full architectural and engineering design, construction administration
  • Criteria: NFPA, NEC, ADA/TAS, FBOP Technical Design Guidelines

Relevant If Your Project Involves:

  • Campus-wide fire alarm replacement
  • Active correctional facility
  • FBOP Technical Design Guidelines
  • EST fire alarm systems