Federal Building Chiller Replacement, Fargo ND

Overview

GSA hired Prime Architects as design-build contractor to replace the cooling system in the Fargo Federal Building/Post Office. The work replaced a 375-ton centrifugal chiller and its pumps. The building stayed occupied and operating during the work.

Technical Scope

  • Assessment/Pre-design: Evaluated all existing cooling-system components to maximize efficiency and reduce energy and water use.
  • Mechanical: Demolished the 375-ton McQuay centrifugal chiller, condenser water pump and chilled water pump. New magnetic-bearing chiller on R-134a, water-cooled by three rooftop fiberglass AEC cooling towers.
  • Controls: New chiller connected to the existing building automation system.
  • Construction: Design, demolition and construction by Prime, with QC and communication plans for the occupied building.

Outcome

Design and construction completed in 2020.

Project Data:

  • Client / agency: U.S. General Services Administration (GSA), Region 8
  • Location: Federal Building/Post Office, Fargo, ND
  • Size: 375-ton chiller replacement
  • Construction cost: $804,281
  • Completed: Design and construction 2020
  • Project type: Infrastructure (HVAC replacement)
  • Delivery / contract: Design-build
  • Facility condition: Occupied federal building, kept accessible and operating throughout
  • Prime Architects role: Prime design-build contractor: planning, design, demolition, construction, project management, QC, inspection and cost control

Relevant If Your Project Involves:

  • Chiller replacement
  • GSA design-build
  • Magnetic-bearing chillers
  • Occupied federal building
  • Energy and water reduction