Overview

Prime Architects designed an HVAC upgrade and renovation of about 17,000 SF in Building 3. Steam radiators were replaced with centralized heating and cooling. The building’s historic auditorium was restored during the same project.

Technical Scope

  • Mechanical: Replaced HVAC units from 3 to 55 tons. Removed all steam radiators; new centralized heating and cooling systems. Relocated the air-cooled chiller on site.
  • Plumbing: Plumbing replacement to eliminate floor leaks.
  • Fire Protection/Life Safety: New sprinkler system throughout the building. Life safety deficiencies addressed.
  • Hazardous Materials: Asbestos abatement on all steam pipe risers.
  • Architecture/Interiors: Auditorium floors, finishes and woodwork restored to retain historic character.
  • Structural: Assessed and repaired wood structure deficiencies in the auditorium.

Challenge and Solution

The building needed full HVAC replacement while keeping its historic auditorium intact. The design restored original floors and woodwork alongside the new systems.

Project Data:

  • Client / agency: Department of Veterans Affairs, Health Care System of the Ozarks
  • Location: Building 3, Veterans Health Care System of the Ozarks, Fayetteville, AR
  • Size: 17,000 SF
  • Est. construction cost: $4,392,734
  • Completed: Design 2017 / construction 12/30/2022
  • Project type: Renovation / infrastructure
  • Delivery / contract: Firm-fixed price
  • Facility condition: Occupied medical campus; historic auditorium; phased construction in an active facility
  • Prime Architects role: Prime A/E: project management, architecture, planning; construction drawings and specifications
  • Design team: MEP Associates (now Salas O'Brien), Norman OK — MEP/FP engineering; 360 Engineering, Tulsa OK — structural engineering; OCMI, Inc. (SDVOSB), Dallas TX — cost estimating

Relevant If Your Project Involves:

  • steam-to-central HVAC conversion
  • historic building renovation
  • new sprinkler system
  • asbestos on pipe risers
  • phased work in an active facility

Project Category:

Part of our VA and federal healthcare architecture work. See the full market page for related projects, standards and how we team on this type of facility.